CYLINDER HEAD REASSEMBLY
PROCEDURE
INSTALL STUD BOLT
Tip:If a stud bolt is deformed or the threads are damaged, replace it.
Install the 8 stud bolts.
Tip:Refer to "SPECIFICATIONS - STANDARD BOLT" for the tightening torque.
INSTALL VALVE STEM OIL SEAL
Apply a light coat of engine oil to a new valve stem oil seal.
-
Using SST, push in the 8 valve stem oil seals.
SST
PZ4TB-04932-49
INSTALL INTAKE VALVE
Place the cylinder head sub-assembly on a wooden block.
Install the 4 intake valves, 4 inner compression springs and 4 valve spring retainers to the cylinder head sub-assembly.
Note:Install the same parts in the same combination to their original locations.
-
Using SST, compress the inner compression spring and place the 8 valve spring retainer locks around the intake valve stem.
09202-70020
09202-00021
Using a 5 mm pin punch and plastic-faced hammer, lightly tap the intake valve stem tip to ensure a proper fit.
Note:Be careful not to damage the intake valve stem tip.
INSTALL EXHAUST VALVE
Place the cylinder head sub-assembly on a wooden block.
Install the 4 exhaust valves, 4 inner compression springs and 4 valve spring retainers to the cylinder head sub-assembly.
Note:Install the same parts in the same combination to their original locations.
-
Using SST, compress the inner compression spring and place the 8 valve spring retainer locks around the exhaust valve stem.
09202-70020
09202-00021
Using a 5 mm pin punch and plastic-faced hammer, lightly tap the exhaust valve stem tip to ensure a proper fit.
Note:Be careful not to damage the exhaust valve stem tip.