PURGE VALVE INSPECTION
PROCEDURE
INSPECT PURGE VSV
Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection
Condition
Specified Condition
1 - 2
20°C (68°F)
23 to 26 Ω
1 - VSV body
Always
10 MΩ or higher
2 - VSV body
Always
10 MΩ or higher
Check the operation of the purge VSV.
-
*a
Does not flow
Check that air does not flow from port E to port F.
-

Air
Apply battery voltage to terminals 1 and 2.
Check that air flows from port E to port F.
If the result is not as specified, replace the purge VSV.
-