OIL COOLER INSTALLATION
PROCEDURE
INSTALL TRANSMISSION OIL COOLER
Apply Toyota Genuine CVT fluid FE to 2 new O-ring.
Install 2 O-rings to the transmission oil cooler.
Install the transmission oil cooler to the continuously variable transaxle assembly with the 3 bolts.
21 N*m
214 kgf*cm
15 ft.*lbf
CONNECT WATER BY-PASS HOSE
Connect the 2 water by-pass hoses to the transmission oil cooler and slide the 2 clips to secure them.
Note:Fully insert the 2 water by-pass hoses until the 2nd rib on each oil cooler pipe.
ADD ENGINE COOLANT (for 1ZR-FAE)
ADD ENGINE COOLANT (for 1ZR-FE)
ADD ENGINE COOLANT (for 2ZR-FE)
ADD CONTINUOUSLY VARIABLE TRANSAXLE FLUID
INSPECT FOR COOLANT LEAK (for 1ZR-FAE)
INSPECT FOR COOLANT LEAK (for 1ZR-FE)
INSPECT FOR COOLANT LEAK (for 2ZR-FE)
INSPECT FOR FLUID LEAK
INSTALL REAR ENGINE UNDER COVER LH (for 1ZR-FAE)
INSTALL REAR ENGINE UNDER COVER LH (for 1ZR-FE)
INSTALL REAR ENGINE UNDER COVER LH (for 2ZR-FE)
INSTALL NO. 1 ENGINE UNDER COVER (for Half Cover Type)
for 1ZR-FAE:
1ZR-FE:
2ZR-FE:
INSTALL NO. 1 ENGINE UNDER COVER (for Full Cover Type)
INSTALL NO. 1 ENGINE UNDER COVER (for Metal Type)
1ZR-FE:
2ZR-FE: