OIL COOLER INSTALLATION

PROCEDURE

  1. INSTALL TRANSMISSION OIL COOLER

    1. Apply Toyota Genuine CVT fluid FE to 2 new O-ring.

    2. Install 2 O-rings to the transmission oil cooler.

    3. Install the transmission oil cooler to the continuously variable transaxle assembly with the 3 bolts.

      21 N*m

      214 kgf*cm

      15 ft.*lbf

  2. CONNECT WATER BY-PASS HOSE

    1. Connect the 2 water by-pass hoses to the transmission oil cooler and slide the 2 clips to secure them.

      Note:

      Fully insert the 2 water by-pass hoses until the 2nd rib on each oil cooler pipe.

  3. ADD ENGINE COOLANT (for 1ZR-FAE)

  4. ADD ENGINE COOLANT (for 1ZR-FE)

  5. ADD ENGINE COOLANT (for 2ZR-FE)

  6. ADD CONTINUOUSLY VARIABLE TRANSAXLE FLUID

  7. INSPECT FOR COOLANT LEAK (for 1ZR-FAE)

  8. INSPECT FOR COOLANT LEAK (for 1ZR-FE)

  9. INSPECT FOR COOLANT LEAK (for 2ZR-FE)

  10. INSPECT FOR FLUID LEAK

  11. INSTALL REAR ENGINE UNDER COVER LH (for 1ZR-FAE)

  12. INSTALL REAR ENGINE UNDER COVER LH (for 1ZR-FE)

  13. INSTALL REAR ENGINE UNDER COVER LH (for 2ZR-FE)

  14. INSTALL NO. 1 ENGINE UNDER COVER (for Half Cover Type)

  15. INSTALL NO. 1 ENGINE UNDER COVER (for Full Cover Type)

  16. INSTALL NO. 1 ENGINE UNDER COVER (for Metal Type)