ENGINE OIL COOLER INSTALLATION

PROCEDURE


  1. INSTALL OIL COOLER ASSEMBLY


    1. Clean the installation surfaces of the oil cooler assembly.

    2. Apply a small amount of engine oil to 2 new O-rings.

    3. Install the 2 O-rings to the stiffening crankcase assembly.

    4. Temporarily install the oil cooler assembly with the 2 bolts and 2 nuts.

    5. A01OAO3C05

      Tighten the 2 bolts and 2 nuts in several steps in the order shown in the illustration.

      Torque:
      25 N*m  { 255 kgf*cm, 18 ft.*lbf }
    6. A01OA9TC02
      *1 No. 7 Water By-pass Hose
      *2 No. 8 Water By-pass Hose
      *a Paint Mark
      *b Up
      *c 35°

      Connect the No. 7 water by-pass hose and No. 8 water by-pass hose to the oil cooler assembly and slide the 2 clips to secure them.

      Tech Tips

      Install the clips so that they are positioned as shown in the illustration.

  2. CONNECT NO. 4 INVERTER COOLING HOSE (for RHD)


    1. Engage the clamp and connect the No. 4 inverter cooling hose to the front No. 1 stabilizer bracket LH.

  3. CONNECT WIRE HARNESS (for RHD)


    1. Connect the wire harness with the bolt.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
    2. Engage the 2 clamps.

  4. INSTALL POWER STEERING LINK ASSEMBLY (for LHD)

    Click here

  5. ADD ENGINE OIL

    Click here

  6. ADD ENGINE COOLANT (for Engine)

    Click here

  7. CHECK ENGINE OIL LEVEL

    Click here

  8. INSPECT FOR OIL LEAK

    Click here

  9. INSPECT FOR COOLANT LEAK (for Engine)

    Click here

  10. INSTALL NO. 2 ENGINE UNDER COVER

    Click here

  11. INSTALL FRONT SUSPENSION MEMBER BRACE

    Click here

  12. INSTALL REAR ENGINE UNDER COVER LH

    Click here

  13. INSTALL NO. 1 ENGINE UNDER COVER ASSEMBLY

    Click here