MONOLITHIC CONVERTER(w/ Glow Plug Controller) INSTALLATION

CAUTION / NOTICE / HINT

Tip:

After replacing the DPF catalytic converter, perform the "DPF Deterioration Record Clear" function using the GTS.

Click here

PROCEDURE

  1. INSTALL NO. 2 EXHAUST GAS TEMPERATURE SENSOR

  2. INSTALL NO. 1 VACUUM PIPE

    1. Temporarily install the No. 1 vacuum pipe to the No. 2 exhaust manifold.

    2. Connect the No. 1 vacuum pipe to the exhaust manifold with the bolt.

      21 N*m

      214 kgf*cm

      15 ft.*lbf

    3. A359368C01

      *a

      Torque Wrench Fulcrum Length

      Using a 14 mm union nut wrench, tighten the No. 1 vacuum pipe.

      Specified tightening torque

      48 N*m

      489 kgf*cm

      35 ft.*lbf

      Tip:
      • Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.

        Click hereClick here

      • When using a 14 mm union nut wrench (fulcrum length of 25 mm (0.984 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 42 N*m (428 kgf*cm, 31 ft.*lbf)

  3. INSTALL NO. 2 EXHAUST MANIFOLD

    1. Install a new outlet turbine elbow gasket to the turbocharger sub-assembly.

    2. A349576

      As shown in the illustration, secure the No. 2 exhaust manifold to the vehicle using a rope or similar.

      Note:

      Make sure to perform this step in order to prevent the exhaust manifold from falling.

    3. A359369C01

      *a

      Torque Wrench Fulcrum Length

      Temporarily install the No. 1 manifold support bracket to the cylinder block sub-assembly with the 3 bolts.

    4. Using a 12 x 14 mm offset wrench and a 12 mm hexagon socket wrench, tighten the bolt A.

      Specified tightening torque

      37 N*m

      377 kgf*cm

      27 ft.*lbf

      Tip:
      • Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.

        Click hereClick here

      • When using a 12 x 14 mm offset wrench and a 12 mm hexagon socket wrench (fulcrum length of 206 mm (8.11 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 17 N*m (173 kgf*cm, 13 ft.*lbf)

    5. Tighten the 2 bolts B.

      37 N*m

      377 kgf*cm

      27 ft.*lbf

    6. Temporarily install the No. 2 exhaust manifold to the turbocharger sub-assembly, No. 1 manifold support bracket, manifold stay and No. 2 manifold support bracket with the 4 bolts and 3 new nuts.

      A359367E01
    7. Tighten the 4 bolts and 3 nuts in the order shown in the illustration.

      Bolt

      37 N*m

      377 kgf*cm

      27 ft.*lbf

      Nut

      26 N*m

      265 kgf*cm

      19 ft.*lbf

  4. INSTALL DRIVE SHAFT HEAT INSULATOR SUB-ASSEMBLY

    1. Install the drive shaft heat insulator sub-assembly to the No. 1 manifold support bracket with the 2 nuts.

      17.6 N*m

      179 kgf*cm

      13 ft.*lbf

  5. INSTALL NO. 4 MANIFOLD SUPPORT BRACKET

    1. A349573E01

      Install the No. 4 manifold support bracket to the No. 2 exhaust manifold and No. 1 manifold support bracket with the 3 bolts in the order shown in the illustration.

      37 N*m

      377 kgf*cm

      27 ft.*lbf

  6. INSTALL FRONT SUSPENSION CROSSMEMBER SUB-ASSEMBLY

  7. INSTALL NO. 5 MANIFOLD SUPPORT BRACKET

    1. A349572E01

      Install the No. 5 manifold support bracket to the No. 2 exhaust manifold and cylinder block sub-assembly with the 2 bolts in the order shown in the illustration.

      37 N*m

      377 kgf*cm

      27 ft.*lbf

  8. INSTALL NO. 2 VACUUM PIPE

    1. Temporarily install the No. 2 vacuum pipe to the No. 2 exhaust manifold.

    2. Connect the No. 2 vacuum pipe to the manifold stay with the bolt.

      21 N*m

      214 kgf*cm

      15 ft.*lbf

    3. A359370C01

      *a

      Torque Wrench Fulcrum Length

      Using a 14 mm union nut wrench, tighten the No. 2 vacuum pipe.

      Specified tightening torque

      30 N*m

      306 kgf*cm

      22 ft.*lbf

      Tip:
      • Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.

      • When using a 14 mm union nut wrench (fulcrum length of 25 mm (0.984 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 26 N*m (265 kgf*cm, 19 ft.*lbf)

        Click hereClick here

    4. Connect the wire harness to the No. 2 vacuum pipe.

  9. INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR

  10. INSTALL FRONT EXHAUST PIPE ASSEMBLY

    1. A128853

      Using a vernier caliper, measure the free length of the compression springs.

      Minimum Free Length (Front)

      41.5 mm (1.63 in.)

      Minimum Free Length (Rear)

      38.5 mm (1.52 in.)

      If the free length is less than the minimum, replace the compression spring.

    2. Temporarily install 2 new gaskets to the front exhaust pipe assembly and No. 2 exhaust manifold.

    3. A181728C47

      *1

      Front Exhaust Pipe Assembly or No. 2 Exhaust Manifold

      *2

      Gasket

      *a

      Wooden Block

      Using a plastic hammer and wooden block, tap in the 2 gaskets until each surface is flush with the front exhaust pipe assembly and No. 2 exhaust manifold.

      Note:
      • Be sure to install the gaskets in the correct direction.

      • Do not reuse the gaskets.

      • Do not damage the gaskets.

      • Do not push in the gaskets by using the exhaust pipes when connecting them.

    4. Connect the front exhaust pipe assembly to the 2 exhaust pipe supports.

    5. Install the front exhaust pipe assembly to the No. 2 exhaust manifold with the 2 bolts and 2 compression springs.

      43 N*m

      438 kgf*cm

      32 ft.*lbf

      A258941C01

      *1

      No. 2 Exhaust Manifold

      *2

      Front Exhaust Pipe Assembly

      *3

      Gasket

      *a

      Space between Flanges: 8.5 mm (0.335 in.)

      Tip:

      After installation, check that the space between the flanges of the No. 2 exhaust manifold and front exhaust pipe assembly are consistent front-to-rear and left-to-right.

    6. Install the front exhaust pipe assembly to the center exhaust pipe assembly with the 2 compression springs and 2 bolts.

      43 N*m

      438 kgf*cm

      32 ft.*lbf

      A258941C01

      *1

      Front Exhaust Pipe Assembly

      *2

      Center Exhaust Pipe Assembly

      *3

      Gasket

      *a

      Space between Flanges: 6.5 mm (0.256 in.)

      Tip:

      After installation, check that the space between the flanges of the front exhaust pipe assembly and center exhaust pipe assembly are consistent front-to-rear and left-to-right.

  11. INSTALL FRONT CENTER FLOOR BRACE SUB-ASSEMBLY

  12. INSTALL FRONT DRIVE SHAFT ASSEMBLY RH

  13. INSTALL NO. 1 TURBO INSULATOR

    1. Install the No. 1 turbo insulator to the turbocharger sub-assembly and No. 2 exhaust manifold with the 3 bolts.

      7.0 N*m

      71 kgf*cm

      62 in.*lbf

    2. Connect the wire harness to the No. 1 turbo insulator.

  14. INSTALL NO. 1 AIR TUBE

  15. INSTALL AIR CLEANER CASE SUB-ASSEMBLY

  16. INSTALL AIR CLEANER CAP SUB-ASSEMBLY

  17. INSTALL BATTERY

  18. INSTALL NO. 2 HOSE TO HOSE TUBE (for LHD)

    1. Connect the No. 2 hose to hose tube to the vehicle body with the 2 nuts.

      5.4 N*m

      55 kgf*cm

      48 in.*lbf

    2. Connect the check valve to connector tube hose to the No. 2 hose to hose tube and slide the clip to secure it.

  19. INSTALL NO. 2 HOSE TO HOSE TUBE (for RHD)

    1. Connect the No. 2 hose to hose tube to the vehicle body with the 2 nuts.

      5.4 N*m

      55 kgf*cm

      48 in.*lbf

  20. INSTALL SENSOR BRACKET

    1. Install the sensor bracket to the cylinder head cover sub-assembly with the 2 bolts.

      11 N*m

      112 kgf*cm

      8 ft.*lbf

  21. INSTALL DIFFERENTIAL PRESSURE SENSOR

  22. INSTALL EXHAUST GAS TEMPERATURE SENSOR

  23. INSTALL AIR FUEL RATIO SENSOR

  24. LEARNING DIFFERENTIAL PRESSURE SENSOR ASSEMBLY

  25. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click hereClick hereClick hereClick here

  26. INSPECT FOR EXHAUST GAS LEAK