PROCEDURE
INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY
Move the shift lever to N.
Temporarily install the park/neutral position switch assembly to the continuously variable transaxle assembly with the 2 bolts.
Install the lock plate and lock nut to the park/neutral position switch assembly.
Temporarily install the control shaft lever to the park/neutral position switch assembly.
| *a | P Position |
| *b | N Position |
Turn the control shaft lever clockwise until it stops, then turn it counterclockwise 2 notches.
Remove the control shaft lever from the park/neutral position switch assembly.
| *a | Neutral Basic Line |
| *b | Protrusion |
Align the protrusion with the neutral basic line.
Hold the park/neutral position switch assembly in that position and tighten the 2 bolts.
Using a screwdriver, bend down the tabs of the lock plate.
Install the control shaft lever to the park/neutral position switch assembly with the washer and nut.
Connect the park/neutral position switch assembly connector.
CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
Connect the transmission control cable assembly to the control shaft lever with the nut.
Note
Before connecting the transmission control cable assembly, check that the park/neutral position switch assembly and shift lever are in neutral.
Connect the transmission control cable assembly to the No. 1 transmission control cable bracket with a new clip.
INSPECT SHIFT LEVER POSITION
ADJUST SHIFT LEVER POSITION
INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
ADJUST PARK/NEUTRAL POSITION SWITCH ASSEMBLY
INSTALL BATTERY CARRIER SUPPORT
INSTALL BATTERY CARRIER
INSTALL BATTERY
INSTALL CENTER NO. 1 COWL TOP VENTILATOR LOUVER
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.