INTERCOOLER INSTALLATION
PROCEDURE
INSTALL INTERCOOLER ASSEMBLY
Install the intercooler assembly with the 2 bolts.
7.0 N*m
71 kgf*cm
62 in.*lbf
INSTALL NO. 1 RADIATOR SUPPORT
Install the No. 1 radiator support with the 5 bolts.
7.0 N*m
71 kgf*cm
62 in.*lbf
CONNECT NO. 3 AIR HOSE
-
*a
View A
*b
Upper
*c
Rear Side
*d
300° (Hose Clamp Area)
*e
Paint Mark
*f
Stopper
Connect the No. 3 air hose to the intercooler assembly as shown in the illustration.
-
Tighten the clamp of the No. 3 air hose on the intercooler assembly side.
6.5 N*m
66 kgf*cm
58 in.*lbf
Note:One minute after tightening the hose clamp, check that residual torque is 3.2 N*m (33 kgf*cm, 28 in.*lbf) or more.
Tip:Push in the No. 3 air hose so that distance B is 0 to 2 mm (0 to 0.0787 in.).
Position the clamp so that distance A is 4 to 9 mm (0.157 to 0.354 in.).
-
CONNECT NO. 2 AIR HOSE
-
*a
View A
*b
Upper
*c
LH Side
*d
135° (Hose Clamp Area)
*e
Paint Mark
*f
Stopper
Connect the No. 2 air hose to the intercooler assembly as shown in the illustration.
-
Tighten the clamp of the No. 2 air hose on the intercooler assembly side.
6.5 N*m
66 kgf*cm
58 in.*lbf
Note:One minute after tightening the hose clamp, check that residual torque is 3.2 N*m (33 kgf*cm, 28 in.*lbf) or more.
Tip:Push in the No. 2 air hose so that distance B is 0 to 2 mm (0 to 0.0787 in.).
Position the clamp so that distance A is 4 to 9 mm (0.157 to 0.354 in.).
-
INSTALL UPPER RADIATOR SUPPORT SUB-ASSEMBLY
CONNECT NO. 1 WATER HOSE CLAMP BRACKET
INSTALL HEADLIGHT ASSEMBLY LH
INSTALL HEADLIGHT ASSEMBLY RH
Tip:Use the same procedures for the RH side and LH side.