8NR-FTS BATTERY INSTALLATION

PROCEDURE


  1. INSTALL BATTERY

    Tech Tips

    Perform "clear the integrated current value", "switch battery type" after replacing the battery.

    Click here


    1. Install the battery to the vehicle.

    2. B008MID

      Install the No. 2 battery clamp with the bolt.

      Torque:
      15.4 N*m  { 157 kgf*cm, 11 ft.*lbf }
    3. Install the battery insulator to the battery.

    4. Connect the cable to the positive (+) battery terminal and engage the clamp.

    5. Tighten the nut.

      Torque:
      5.6 N*m  { 57 kgf*cm, 50 in.*lbf }
    6. B008M9H

      Engage the 2 claws and install the fusible link cover.

  2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


    1. Connect the cable to the negative (-) battery terminal and tighten the nut.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }

      Note

      When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

      Click here

  3. PERFORM INITIALIZATION


    1. Perform "clear the integrated current value", "switch battery type" after replacing the battery.

      Click here