FRONT CRANKSHAFT OIL SEAL INSTALLATION

PROCEDURE

  1. INSTALL TIMING CHAIN COVER OIL SEAL

    1. Apply MP grease to the lip of a new timing chain cover oil seal.

      Note:
      • Keep the lip free from foreign matter.

    2. A157500N05

      Using SST and a hammer, tap in the timing chain cover oil seal until its surface is flush with the front crankshaft oil seal retainer edge.

      09223-22010

      Note:
      • Wipe off excess grease from the crankshaft.

      • Do not tap in the timing chain cover oil seal at an angle.

      Tip:

      Timing chain cover oil seal tap in depth: - 1.0 to 1.0 mm (-0.0397 to 0.0397 in.)

  2. INSTALL CRANKSHAFT PULLEY

    1. Align the pulley set key with the key groove of the crankshaft pulley.

    2. A234915C01

      *a

      Turn

      *b

      Hold

      Using SST, hold the crankshaft pulley in place and tighten the bolt.

      for 86 mm (3.39 in.) Bolt Pitch Type:

      09213-58014

      91551-80840

      09330-00021

      for 64 mm (2.52 in.) Bolt Pitch Type:

      09213-54015

      09330-00021

      190 N*m

      1937 kgf*cm

      140 ft.*lbf

      Tip:

      For the 64 mm (2.52 in.) bolt pitch type, the part number of the installation bolt for SST (crankshaft pulley holding tool) is 91551-00850 (quantity: 2).

  3. INSTALL FRONT SUSPENSION MEMBER REINFORCEMENT RH

  4. INSTALL V-RIBBED BELT

  5. INSPECT FOR OIL LEAK