BLOW BY HEATER INSTALLATION

PROCEDURE

  1. INSTALL BLOW BY HEATER (VENTILATION NO. 1 CONNECTOR) (w/ HEATER)

    1. Install the blow by heater(ventilation No. 1 connector) with the bolt.

      8.0 N*m

      82 kgf*cm

      71 in.*lbf

    2. Engage the 2 clamps.

    3. Connect the blow by heater(ventilation No. 1 connector) connector.