ECM INSTALLATION

PROCEDURE

  1. INSTALL NO. 2 ECM BRACKET

    1. Install the No. 2 ECM bracket to the ECM with the 2 screws.

      3.0 N*m

      31 kgf*cm

      27 in.*lbf

  2. INSTALL ECM BRACKET

    1. Install the ECM bracket to the ECM with the 2 screws.

      3.0 N*m

      31 kgf*cm

      27 in.*lbf

  3. INSTALL ECM

    1. Engage the guide and install the ECM with the 2 bolts.

      12.5 N*m

      127 kgf*cm

      9 ft.*lbf

      Note:

      If the ECM has been struck or dropped, replace it.

    2. A354278

      Connect the 2 ECM connectors and lower the 2 levers.

      Note:
      • When connecting the ECM connectors, make sure that the connecting parts of the ECM connectors are free of dirt, water or other foreign matter.

      • Be sure to securely connect the ECM connectors.

    3. Engage the wire harness clamp.

    4. Install the No. 1 air cleaner inlet with the bolt.

      7.0 N*m

      71 kgf*cm

      62 in.*lbf

  4. INSTALL AIR CLEANER CASE SUB-ASSEMBLY

  5. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE

  6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here

  7. PERFORM INITIALIZATION

  8. GPF DEPOSITION VALUES

    Note:

    Before replacing the ECM, store the volumes of accumulated ash (metal oxide) and PM (Particulate Matter). After replacing the ECM, write the volumes of accumulated ash and PM to the new ECM. (w/ Gasoline Particulate Filter)

    Click here