POWER SWITCH INSTALLATION

PROCEDURE


  1. INSTALL POWER SWITCH


    1. Engage the 2 claws to install the power switch.

  2. INSTALL INTEGRATION CONTROL AND PANEL

    Click here

  3. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  4. INSTALL DECK FLOOR BOX RH

    Click here

  5. INSTALL REAR DECK FLOOR BOX

    Click here

  6. INSTALL NO. 2 DECK BOARD

    Click here

  7. INSTALL NO. 1 DECK BOARD

    Click here

  8. INSTALL DECK BOARD ASSEMBLY

    Click here