VACUUM SWITCHING VALVE INSTALLATION


  1. INSTALL VACUUM SWITCHING VALVE (for EVAP)


    1. A01DZO6

      Install the VSV with the bolt.

      Torque:
      9.0 N*m  { 92 kgf*cm, 80 in.*lbf }
    2. Connect the 2 hoses to the VSV.

    3. Connect the VSV connector.

  2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

  3. PERFORM INITIALIZATION


    1. Perform initialization Click here.

      CAUTION:

      Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.