CANISTER INSTALLATION


  1. INSTALL CHARCOAL CANISTER ASSEMBLY


    1. A01NEOS

      Install the charcoal canister assembly with the 2 bolts.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
    2. Connect the 3 clamps.

    3. A01NDNPE01
      Text in Illustration
      *1 Retainer

      Install the 2 bolts and clip.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
    4. Connect the air inlet line.

    5. Connect the purge line hose.

    6. Push in the vent line tube until the retainer makes a "click" sound.

  2. INSTALL FRONT CENTER FLOOR COVER


    1. A01NGRZE01
      Text in Illustration
      *1 Bolt
      *2 Screw

      Connect the 3 clips and install the front center floor cover.

    2. Install the 7 bolts and 2 screws.

  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.