DIESEL THROTTLE BODY (w/o EGR Cooler) INSTALLATION


  1. INSTALL DIESEL THROTTLE BODY ASSEMBLY

    A01E2KU

    1. Install a new gasket and the throttle body with the 2 bolts and 2 nuts.

      Torque:
      20 N*m  { 204 kgf*cm, 15 ft.*lbf }
    2. A01DZU2

      Connect the 2 connectors.

  2. INSTALL NO. 2 AIR CLEANER PIPE SUB-ASSEMBLY

    A01E0K7

    1. Connect the pipe (with the 2 air hoses) and install the bolt.

      Torque:
      20 N*m  { 204 kgf*cm, 15 ft.*lbf }
    2. Tighten the 2 clamps.

    3. Connect the vacuum hose to the gas filter.

    4. Connect the manifold absolute pressure sensor connector.

  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

  4. PERFORM INITIALIZATION


    1. Perform initialization Click here.

      Note

      Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.