AIR CONDITIONING AMPLIFIER INSTALLATION

PROCEDURE


  1. INSTALL AIR CONDITIONING AMPLIFIER ASSEMBLY


    1. Connect each connector.

    2. for LHD:


      1. B0083UBC01
        *a Lower Part of Air Conditioning Amplifier Assembly
        *b Rib of Air Conditioner Unit Assembly
        *c Align
        B00847Z Install in this Direction

        Align the lower part of the air conditioning amplifier assembly with the rib of the air conditioner unit assembly and engage the guide as shown in the illustration.

    3. for RHD:


      1. B0089HGC01
        *a Rib of Air Conditioning Amplifier Assembly
        *b Rib of Air Conditioner Unit Assembly
        *c Align
        B00847Z Install in this Direction

        Align the rib of the air conditioning amplifier assembly with the rib of the air conditioner unit assembly and engage the guide as shown in the illustration.

    4. B00853X

      Move the air conditioning amplifier assembly in each direction shown in the illustration to check that the guide is securely engaged.

    5. Install the air conditioning amplifier assembly with the screw.

    6. for LHD:


      1. Engage each clamp.

    7. for RHD:


      1. B008666

        Install the front floor carpet assembly to its original position as shown in the illustration.

      2. Install the front floor carpet clip.

  2. INSTALL ACCELERATOR PEDAL (for LHD)

    for 2AR-FE:

    Click here

    for A25A-FKS:

    Click here

    for 2GR-FKS:

    Click here

  3. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY (for RHD)

    Click here