KNEE AIRBAG ASSEMBLY INSTALLATION

PROCEDURE


  1. INSTALL LOWER NO. 1 INSTRUMENT PANEL AIRBAG ASSEMBLY


    1. Check that the power switch is off.

    2. Check that the cable is disconnected from the negative (-) auxiliary battery terminal.

      CAUTION:

      Wait at least 90 seconds after disconnecting the cable from the negative (-) auxiliary battery terminal to disable the SRS system.

    3. B005YTQE03
      Text in Illustration
      *1 Airbag Connector
      *2 Airbag Connector Lock

      Connect the airbag connector to the lower No. 1 instrument panel airbag assembly.

      Note

      When connecting any airbag connector, take care not to damage the airbag wire harness.

    4. Push in the airbag connector lock to install the airbag connector.

    5. Install the clamp.

    6. for LHD:


      1. Engage the 2 claws to connect the DLC3.

    7. B005Y34E01
      Text in Illustration
      *1 Hook
      *A for RHD
      *B for LHD

      Temporarily install the lower No. 1 instrument panel airbag assembly with the 2 hooks.

    8. Engage the 6 claws and 3 guides to install the lower No. 1 instrument panel airbag assembly.

    9. Install the 4 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }

      Note

      Confirm that the lower No. 1 instrument panel airbag assembly is installed securely without any excessive gaps and is not protruding outward.

  2. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY

    Click here

  3. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY

    Click here

  4. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL ASSEMBLY

    Click here

  5. INSTALL UPPER INSTRUMENT PANEL FINISH PANEL

    Click here

  6. INSTALL INTEGRATION CONTROL AND PANEL

    Click here

  7. INSTALL CONSOLE BOX ASSEMBLY

    Click here

  8. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  9. INSTALL DECK FLOOR BOX RH

    Click here

  10. INSTALL REAR DECK FLOOR BOX

    Click here

  11. INSTALL NO. 1 DECK BOARD

    Click here

  12. INSTALL NO. 2 DECK BOARD

    Click here

  13. INSTALL DECK BOARD ASSEMBLY

    Click here

  14. PERFORM DIAGNOSTIC SYSTEM CHECK

    Click here

  15. INSPECT SRS WARNING LIGHT

    Click here