PROCEDURE
INSTALL AIR CONDITIONING CONTROL ASSEMBLY
After aligning with the cables, engage the 2 claws and connect the heater control cable sub-assembly. (for RH side).
After aligning with the cables, engage the 2 claws and connect the heater control cable sub-assembly. (for LH side).
Connect each connector.
Engage the 6 claws.
Install the air conditioning control assembly with the 2 screws.
INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH
INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH
INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY
INSTALL CONSOLE BOX ASSEMBLY