POWER MANAGEMENT CONTROL ECU INSTALLATION
CAUTION / NOTICE / HINT
A bolt without a torque specification is shown in the standard bolt chart (Click here).
PROCEDURE
INSTALL POWER MANAGEMENT CONTROL ECU
Attach the 2 claws to install the power management control ECU.
INSTALL ECU INTEGRATION BOX RH
Install the ECU integration box RH with the 2 nuts and bolt.
Attach the clamp.
Connect all the connectors.
Note:Do not twist the connectors of ECU when connecting them.
Do not apply more force than necessary to the connectors. If more than 98 N (10 kgf, 22 lbf) of force is applied to a connector, the connector or connector holder may be damaged.
INSTALL NO. 2 AIR DUCT SUB-ASSEMBLY
INSTALL TELEMATICS TRANSCEIVER
INSTALL INSTRUMENT PANEL BOX ASSEMBLY
INSTALL INSTRUMENT PANEL BOX DOOR COVER
INSTALL LOWER NO. 2 INSTRUMENT PANEL AIRBAG ASSEMBLY
INSTALL LOWER INSTRUMENT COVER LH
INSTALL NO. 2 INSTRUMENT PANEL REGISTER ASSEMBLY
INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL GARNISH
INSTALL INSTRUMENT SIDE PANEL RH
INSTALL INSTRUMENT PANEL FINISH PANEL END RH
INSTALL FRONT NO. 2 CONSOLE BOX INSERT
INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
INSTALL COWL SIDE TRIM BOARD RH
INSTALL DOOR SCUFF PLATE ASSEMBLY RH
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note:When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).
CHECK SRS WARNING LIGHT
Check the SRS warning light (Click hereClick here).