COOLER EXPANSION VALVE INSTALLATION

PROCEDURE

  1. INSTALL COOLER EXPANSION VALVE

    1. Apply sufficient compressor oil to 2 new O-rings and the fitting surfaces of the cooler expansion valve.

      Refrigerant

      Compressor Oil

      HFC-134a (R134a)

      ND-OIL 8 or equivalent

      HFO-1234yf (R1234yf)

      ND-OIL 12 or equivalent

    2. Install the 2 O-rings to the No. 1 cooler evaporator sub-assembly.

    3. Using a 4 mm hexagon wrench, install the cooler expansion valve with the 2 hexagon bolts.

      3.5 N*m

      36 kgf*cm

      31 in.*lbf

  2. CONNECT AIR CONDITIONING TUBE (except Sub-cool Accelerator)

  3. CONNECT SUCTION PIPE SUB-ASSEMBLY (for Sub-cool Accelerator)

  4. INSTALL NO. 3 COWL TOP PANEL INSULATOR (for 2WW)

  5. INSTALL NO. 1 ENGINE COVER (for 2WW)

  6. CHARGE AIR CONDITIONING SYSTEM WITH REFRIGERANT

    1. for HFC-134a (R134a):

      Click here

    2. for HFO-1234yf (R1234yf):

      Click here

  7. WARM UP ENGINE

    1. for HFC-134a (R134a):

      Click here

    2. for HFO-1234yf (R1234yf):

      Click here

  8. INSPECT FOR REFRIGERANT LEAK

    1. for HFC-134a (R134a):

      Click here

    2. for HFO-1234yf (R1234yf):

      Click here