ECM INSTALLATION

PROCEDURE


  1. INSTALL ECM


    1. Install the No. 2 ECM bracket to the ECM with the 2 screws.

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
    2. Install the No. 1 ECM bracket to the ECM with the 2 screws.

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
    3. Install the ECM with bracket with the 2 bolts.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
    4. A004OIM

      Connect the 2 ECM connectors and lower the 2 levers.

      Note


      • When connecting the ECM connector, make sure that dirt, water or other foreign matter is not stuck between the ECM connector and ECM.

      • Make sure that the 2 levers are securely lowered.

  2. CONNECT NO. 1 AIR CLEANER INLET


    1. Connect the No. 1 air cleaner inlet with the bolt.

      Torque:
      7.0 N*m  { 71 kgf*cm, 62 in.*lbf }
  3. INSTALL AIR CLEANER CASE SUB-ASSEMBLY

    Click here

  4. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY

  5. INSTALL AIR CLEANER CAP SUB-ASSEMBLY


    1. Install the air cleaner cap sub-assembly to the air cleaner hose assembly and tighten the hose clamp.

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
    2. Attach the 2 clamps.

    3. Connect the mass air flow meter connector and attach the wire harness clamp.

  6. INSTALL NO. 1 ENGINE COVER

    Click here

  7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  8. PERFORM REGISTRATION

    Click here

  9. PERFORM INITIALIZATION

    Click here