EGR BYPASS VALVE SWITCHING VALVE INSTALLATION

PROCEDURE

  1. INSTALL EGR BYPASS VALVE SWITCHING VALVE (NO. 1 VACUUM SWITCHING VALVE ASSEMBLY)

    1. Using a 4 mm hexagon socket wrench, install the EGR bypass valve switching valve (No. 1 vacuum switching valve assembly) with the 2 bolts.

      5.0 N*m

      51 kgf*cm

      44 in.*lbf

    2. Connect the 2 vacuum hoses.

    3. Connect the EGR bypass valve switching valve (No. 1 vacuum switching valve assembly) connector.

  2. INSTALL NO. 1 ENGINE COVER

  3. INSTALL OUTER COWL TOP PANEL

  4. INSTALL DIFFERENTIAL PRESSURE SENSOR ASSEMBLY

  5. INSTALL NO. 2 HEATER AIR DUCT SPLASH SHIELD SEAL

  6. INSTALL WATER GUARD PLATE LH

  7. INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY