SHIFT LEVER INSTALLATION

PROCEDURE


  1. INSTALL SHIFT LOCK CONTROL UNIT ASSEMBLY


    1. Connect the 3 connectors to shift lock control unit assembly.

    2. Install the shift lock control unit assembly with the 3 nuts.

      Torque:
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }
  2. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY

    Click here

  3. INSTALL CONSOLE BOX ASSEMBLY

    Click here

  4. INSTALL UPPER INSTRUMENT PANEL FINISH PANEL

    Click here

  5. INSTALL INTEGRATION CONTROL AND PANEL

    Click here

  6. INSTALL SHIFT LEVER KNOB


    1. Using a die (M6 x P1.00 mm), clean the threads of the shift control unit assembly.

    2. A005ASC

      Turn the shift lever knob in the direction of the arrow in the illustration to install it.

    3. A005C4EE01
      Text in Illustration
      *a Measuring Point

      Using a vernier caliper, adjust the height of the shift lever knob.

      Standard height
      11.74 mm (0.462 in.)
    4. Remove the protective tape around the shift lock control unit assembly.

  7. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  8. INSTALL DECK FLOOR BOX RH

    Click here

  9. INSTALL REAR DECK FLOOR BOX

    Click here

  10. INSTALL NO. 2 DECK BOARD

    Click here

  11. INSTALL NO. 1 DECK BOARD

    Click here

  12. INSTALL DECK BOARD ASSEMBLY

    Click here

  13. INSPECT SHIFT LEVER


    1. Turn the power switch on (READY).

    2. Check that all available shift positions can be selected by moving the shift lever.

      Tech Tips

      After the shift lock control unit assembly is replaced with a new one, perform the above operation. If this operation is not performed, moving the shift lever may not initially select shift positions.