DIESEL THROTTLE BODY INSTALLATION

PROCEDURE

  1. INSTALL DIESEL THROTTLE BODY ASSEMBLY

    1. Install a new gasket and the diesel throttle body assembly with the 4 bolts.

      11 N*m

      112 kgf*cm

      8 ft.*lbf

    2. Engage the wire harness clamp and install the wire harness with the nut.

      8.4 N*m

      86 kgf*cm

      74 in.*lbf

    3. Connect the 2 connectors.

  2. INSTALL NO. 2 AIR TUBE ASSEMBLY

    1. Install the No. 2 air tube assembly and tighten the 2 hose clamps.

    2. Install the 2 bolts.

      11 N*m

      112 kgf*cm

      8 ft.*lbf

    3. Connect the connector.

  3. INSTALL NO. 3 AIR HOSE

  4. INSTALL NO. 1 ENGINE COVER (w/ No. 1 Engine Cover)

  5. INSTALL NO. 1 ENGINE UNDER COVER

  6. PERFORM INITIALIZATION