СИСТЕМА SFI Starter Signal Circuit

DESCRIPTION

While the engine is being cranked, current flows from terminal STA2 of the engine stop and start ECU to terminal STA of the ECM (STA signal).

WIRING DIAGRAM

Refer to DTC P0617.

Click here

CAUTION / NOTICE / HINT

Note


  • Inspect the fuses for circuits related to this system before performing the following procedure.

  • When the starter assembly is replaced, the number of starter operations stored in the engine stop and start ECU must be reset.

    Click here

PROCEDURE


  1. CHECK WHETHER ENGINE CAN BE CRANKED


    1. Check if the engine can be cranked.

      Result
      Result Proceed to
      Engine cannot be cranked A
      Engine can be cranked B

    B
    A
  2. READ VALUE USING GTS (STARTER SIGNAL)


    1. Connect the GTS to DLC3.

    2. Turn the engine switch on (IG).

    3. Turn the GTS on.

    4. Enter the following menus: Powertrain / Engine and ECT / Data List / All Data / Starter Signal.


      Powertrain > Engine > Data List
      Tester Display
      Starter Signal
    5. Check the result when the engine switch is on (IG) and the engine starts.

      OK
      Condition Starter Signal
      Engine switch on (IG) OFF
      Engine cranking position ON
      Result
      Proceed to
      OK
      NG

    NG
    OK
  3. INSPECT RELAY (ST NO. 2 RELAY)


    1. Inspect the ST NO. 2 relay.

      Click here

      Result
      Proceed to
      OK
      NG

    NG
    OK
  4. INSPECT STARTER ASSEMBLY


    1. Inspect the starter assembly.

      Click here

      Result
      Proceed to
      OK
      NG

    NG
    OK
  5. CHECK HARNESS AND CONNECTOR (ST NO. 2 RELAY - STARTER ASSEMBLY)


    1. Remove the ST NO. 2 relay from the No. 1 engine room relay block.

    2. Disconnect the starter assembly connector.

    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      ST NO. 2 relay terminal 3 - D7-1 (SL2) Always Below 1 Ω
      ST NO. 2 relay terminal 3 or D7-1 (SL2) - Body ground and other terminals Always 10 kΩ or higher
      Result
      Proceed to
      OK
      NG

    NG
    OK
  6. CHECK HARNESS AND CONNECTOR (ST NO. 2 RELAY - ECM)


    1. Remove the ST NO. 2 relay from the No. 1 engine room relay block.

    2. Disconnect the ECM connector.

    3. Disconnect the engine stop and start ECM connector.

    4. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      A53-29 (STA) - ST NO. 2 relay terminal 1 Always Below 1 Ω
      A53-29 (STA) or ST NO. 2 relay terminal 1 - Body ground and other terminals Always 10 kΩ or higher
      Result
      Proceed to
      OK
      NG

    NG
    OK
  7. CHECK HARNESS AND CONNECTOR (ST NO. 2 RELAY - BODY GROUND)


    1. Remove the ST NO. 2 relay from the No. 1 engine room relay block.

    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      ST NO. 2 relay terminal 2 - Body ground Always Below 1 Ω
      Result
      Proceed to
      OK
      NG

    NG
    OK
  8. CHECK HARNESS AND CONNECTOR (BATTERY - ST NO. 2 RELAY)


    1. Remove the ST NO. 2 relay from the No. 1 engine room relay block.

    2. Measure the voltage according to the value(s) in the table below.

      Standard Voltage
      Tester Connection Condition Specified Condition
      ST NO. 2 relay terminal 5 - Body ground Always 11 to 14 V
      Result
      Proceed to
      OK
      NG

    NG
    OK
  9. INSPECT RELAY (ST NO. 1 RELAY)


    1. Inspect the ST NO. 1 relay.

      Click here

      Result
      Proceed to
      OK
      NG

    NG
    OK
  10. CHECK HARNESS AND CONNECTOR (ST NO. 1 RELAY - STARTER ASSEMBLY)


    1. Remove the ST NO. 1 relay from the No. 1 engine room relay block.

    2. Disconnect the starter assembly connector.

    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      ST NO. 1 relay terminal 3 - D7-2 (SL1) Always Below 1 Ω
      ST NO. 1 relay terminal 3 or D7-2 (SL1) - Body ground and other terminals Always 10 kΩ or higher
      Result
      Proceed to
      OK
      NG

    NG
    OK
  11. CHECK HARNESS AND CONNECTOR (ST NO. 1 RELAY - BODY GROUND)


    1. Remove the ST NO. 1 relay from the No. 1 engine room relay block.

    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      ST NO. 1 relay terminal 2 - Body ground Always Below 1 Ω
      Result
      Proceed to
      OK
      NG

    OK
    NG
  12. CHECK STOP AND START SYSTEM


    1. Check the stop and start system.

      Click here

      Result
      Proceed to
      OK
      NG

    OK
    NG
  13. READ VALUE USING GTS (STARTER SIGNAL)


    1. Connect the GTS to DLC3.

    2. Turn the engine switch on (IG).

    3. Turn the GTS on.

    4. Enter the following menus: Powertrain / Engine and ECT / Data List / All Data / Starter Signal.


      Powertrain > Engine > Data List
      Tester Display
      Starter Signal
    5. Check the result when the engine switch is on (IG) and the engine starts.

      OK
      Condition Starter Signal
      Engine switch on (IG) OFF
      Engine cranking position ON
      Result
      Proceed to
      OK
      NG

    OK
    NG