FLOW SHUTTING VALVE(for ATF) INSPECTION

PROCEDURE


  1. INSPECT FLOW SHUTTING VALVE (NO. 1 WATER BY-PASS HOSE)


    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      1 - 2 20°C (68°F) 22 to 28 Ω

      If the result is not as specified, replace the flow shutting valve (No. 1 water by-pass hose).