GENERATOR (for BOSCH Made) INSTALLATION


  1. INSTALL GENERATOR ASSEMBLY

    A01DXLFE01

    1. Install the generator and with the 2 bolts.

      Torque:
      62 N*m  { 632 kgf*cm, 46 ft.*lbf, for bolt A }
      25 N*m  { 255 kgf*cm, 18 ft.*lbf, for bolt B }
    2. Install the generator wire with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    3. Connect the generator connector.

  2. INSTALL FAN AND GENERATOR V BELT


    1. Rotate the V-ribbed belt tensioner pulley clockwise, and then install the fan and generator V belt.

      Note

      Make sure that the fan and generator V belt is set properly on each pulley.

    2. Check that the indicator mark of the V-ribbed belt tensioner Click here.

  3. INSTALL AIR CLEANER ASSEMBLY


    1. Install the air cleaner with the 2 bolts.

      Torque:
      14 N*m  { 143 kgf*cm, 10 ft.*lbf }
    2. w/ Intake Air Temperature Sensor:

      Connect the connector to the intake air temperature sensor.

    3. w/ Mass Air Flow Meter:

      Connect the connector to the mass air flow meter.

    4. Tighten the hose clamp.

    5. for Ventilation Hose Type:

      Connect the ventilation hose.

  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.