COMBINATION METER INSTALLATION

PROCEDURE

  1. INSTALL COMBINATION METER ASSEMBLY

    1. Connect the 2 connectors.

    2. E295099

      Engage the 2 guides as shown in the illustration.

    3. Install the combination meter assembly with the 2 bolts.

  2. INSTALL UPPER NO. 2 STEERING COLUMN COVER

    1. E295096

      Engage the 2 guides as shown in the illustration.

    2. Install the upper No. 2 steering column cover with the 2 screws.

      2.0 N*m

      20 kgf*cm

      18 in.*lbf

  3. INSTALL INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY

    1. E295093

      Engage the 2 guides and 2 clips to install the instrument cluster finish panel assembly as shown in the illustration.

  4. INSTALL STEERING WHEEL ASSEMBLY

  5. CHECK STEERING WHEEL CENTER POINT

  6. INSTALL HORN BUTTON ASSEMBLY