DESCRIPTION
While the engine is being cranked, current flows from terminal ST2 of the ignition switch to the ST fuse and also flows to terminal STA of the ECM (STA signal).
WIRING DIAGRAM
INSPECTION PROCEDURE
Tech Tips
This chart is based on the premise that the engine can crank normally. If the engine cannot crank normally, proceed to the problem symptoms table Click here.
Note
If the ECM is replaced, the new ECM needs initialization Click here.
PROCEDURE
READ VALUE OF INTELLIGENT TESTER (STARTER SIGNAL)
Connect the intelligent tester to the DLC3.
Turn the ignition switch ON and turn the intelligent tester ON.
Enter the following menus: Powertrain / Engine / Data List / Starter Signal.
Read the values.
| Standard | ||||||
|---|---|---|---|---|---|---|
|
| OK |
|
PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE |
| NG |
|
CHECK WIRE HARNESS (ECM - STARTER RELAY (Marking: ST))
Disconnect the E5 ECM connector.
A/T:
Remove the starter relay from the engine room relay block.
M/T:
Disconnect the 2O junction block connector.
Measure the resistance of the wire harness side connectors.
| Standard resistance | ||||||
|---|---|---|---|---|---|---|
|
| Standard resistance | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS AND CONNECTOR |
| OK |
|
REPLACE ECM