PROCEDURE
INSTALL ECM
Install the ECM with the 2 bolts.
Install the 2 wire harness clamps.
Connect the 2 ECM connectors.
Connect the 2 ECM connectors and lower the 2 levers.
Note
When connecting the connectors, make sure that dirt, water or other foreign matter does not get caught between the connectors and other parts.
Make sure that the 2 levers are securely locked.
Install the 2 wire harness clamps.
Install the No. 2 engine room wire with the bolt.
Slide the side cover down and engage the 2 claws to install it.
Slide the engine room wire harness down and engage the 2 claws to install it.
Connect the 3 wire harness connectors.
Install the No. 1 relay block cover.
INSTALL INVERTER RESERVE TANK ASSEMBLY
Install the inverter reserve tank assembly with the 2 bolts.
INSTALL INVERTER WITH CONVERTER ASSEMBLY
CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL
INSTALL DECK FLOOR BOX RH
INSTALL REAR DECK FLOOR BOX
INSTALL NO. 2 DECK BOARD
INSTALL NO. 1 DECK BOARD
INSTALL DECK BOARD ASSEMBLY
PERFORM INITIALIZATION
Note
Perform Initialization when replacing the ECM Click here.
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.