PURGE VALVE INSTALLATION

PROCEDURE

  1. INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY (PURGE VSV)

    1. A324253

      Install the bracket to the No. 1 vacuum switching valve assembly (purge VSV).

    2. Install the bolt and bracket.

      8.0 N*m

      82 kgf*cm

      71 in.*lbf

    3. A324254

      Install the No. 1 vacuum switching valve assembly (purge VSV) and bracket.

    4. Connect the No. 1 vacuum pipe and No. 2 vacuum pipe to the No. 1 vacuum switching valve assembly (purge VSV).

    5. Connect the No. 1 vacuum switching valve assembly (purge VSV) connector.