FRONT DRIVE SHAFT ASSEMBLY(for 1ZR-FAE, 2ZR-FAE) INSTALLATION

PROCEDURE

  1. INSTALL FRONT DRIVE SHAFT ASSEMBLY LH

    1. Coat the spline of the inboard joint shaft with oil.

      Tip:

      Be sure to use the same type of oil that is used for the transaxle.

    2. C206888

      Align the shaft splines and tap in the drive shaft with a brass bar and hammer.

      Note:
      • Make sure that the snap ring opening is facing downwards when installing the drive shaft.

      • Be careful not to damage the oil seal, boot or dust cover.

  2. INSTALL FRONT DRIVE SHAFT ASSEMBLY RH

    Tip:

    Use the same procedure described for the LH side.

  3. ADD MANUAL TRANSAXLE OIL

  4. ADD CONTINUOUSLY VARIABLE TRANSAXLE FLUID

  5. INSPECT FOR OIL LEAK

  6. INSTALL NO. 1 ENGINE UNDER COVER

  7. CLEAN DRIVE SHAFT AND AXLE SHAFT NUT

    1. Clean the threaded parts on the drive shaft and a new axle shaft nut using a non-residue solvent.

      Note:
      • Be sure to perform this work for a new drive shaft.

      • Keep the threaded parts free of oil and foreign objects.

  8. INSTALL FRONT AXLE ASSEMBLY LH

  9. INSTALL FRONT AXLE ASSEMBLY RH

    Tip:

    Use the same procedure described for the LH side.