FRONT DRIVE SHAFT ASSEMBLY(for 1ZR-FAE, 2ZR-FAE) INSTALLATION
PROCEDURE
INSTALL FRONT DRIVE SHAFT ASSEMBLY LH
Coat the spline of the inboard joint shaft with oil.
Tip:Be sure to use the same type of oil that is used for the transaxle.
-
Align the shaft splines and tap in the drive shaft with a brass bar and hammer.
Note:Make sure that the snap ring opening is facing downwards when installing the drive shaft.
Be careful not to damage the oil seal, boot or dust cover.
INSTALL FRONT DRIVE SHAFT ASSEMBLY RH
Tip:Use the same procedure described for the LH side.
ADD MANUAL TRANSAXLE OIL
for EC61: (Click here)
for EC62: (Click here)
ADD CONTINUOUSLY VARIABLE TRANSAXLE FLUID
INSPECT FOR OIL LEAK
INSTALL NO. 1 ENGINE UNDER COVER
for 1ZR-FAE: (Click here)
for 2ZR-FAE: (Click here)
CLEAN DRIVE SHAFT AND AXLE SHAFT NUT
Clean the threaded parts on the drive shaft and a new axle shaft nut using a non-residue solvent.
Note:Be sure to perform this work for a new drive shaft.
Keep the threaded parts free of oil and foreign objects.
INSTALL FRONT AXLE ASSEMBLY LH
INSTALL FRONT AXLE ASSEMBLY RH
Tip:Use the same procedure described for the LH side.