PROCEDURE
INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY
Apply a light coat of engine oil to a new O-ring and install the O-ring to the camshaft timing oil control valve assembly.
Note
Do not damage the O-ring when installing.
Tech Tips
An O-ring is already installed in a new camshaft timing oil control valve assembly. Therefore, the O-ring only needs to be coated with engine oil when the camshaft timing oil control valve assembly is replaced with a new one.
Install the camshaft timing oil control valve assembly to the cylinder head cover sub-assembly with the bolt.
Note
Replace with a new part if it is dropped or if it receives a strong impact.
Make sure that the O-ring is not cracked or jammed when installing.
Connect the camshaft timing oil control valve assembly connector.
Connect the wire harness to the cylinder head cover sub-assembly with the 2 bolts.
INSPECT FOR OIL LEAK
INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY