ROOF DRIP SIDE FINISH MOULDING INSTALLATION

PROCEDURE


  1. INSTALL ROOF DRIP SIDE FINISH MOULDING CLIP (for Standard Roof)

    Note


    • If reusing the clips, do not remove the double-sided tape remaining on the clips and where the clips will be installed on the body.

    • If installing new clips, remove the double-sided tape remaining where the clips will be installed on the body and clean the body with a non-residue solvent.


    1. A005C4IE02
      Text in Illustration
      *1 Adhesive
      *a 2 to 3 mm (0.0787 to 0.118 in.) Bead of Adhesive

      Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to new roof drip side finish moulding clips.

      Tech Tips

      Adhesive strength (tensile strength): 13.7 MPa (140 kgf/cm2, 1987 psi) or more (when the temperature is 23°C (73°F).)

    2. Press and install the 2 roof drip side finish moulding clips.

    3. Install the clips to the positions on the roof panel shown in the illustration. Determine the locations and firmly press and install the 2 roof drip side finish moulding clips after lightly applying adhesive (3M DP-105 or equivalent).

      A005CDEE02
      Text in Illustration
      *1 Protruding Part - -
      Standard Dimension
      Installation Area Dimension Measurement
      for Front Side A 3.5 mm (0.138 in.)
      B 2.5 mm (0.0984 in.)
      C 0.8 mm (0.0314 in.)
      for Rear Side D 3.5 mm (0.138 in.)
      E 0.8 mm (0.0314 in.)
      F 3.5 mm (0.138 in.)
    4. Install the roof drip center side finish moulding when 20 minutes or more have elapsed after pressing and installing the 2 roof drip side finish moulding clips.

      Tech Tips


      • Initial hardening time: 20 minutes

      • Complete hardening time: 48 hours

  2. INSTALL ROOF DRIP CENTER SIDE FINISH MOULDING (for Standard Roof)


    1. Engage the 2 clips and install the roof drip center side finish moulding.

  3. INSTALL ROOF DRIP SIDE FINISH MOULDING CLIP (for Glass Roof)

    Note


    • If reusing the clips, do not remove the double-sided tape remaining on the clips and where the clips will be installed on the body.

    • If installing new clips, remove the double-sided tape remaining where the clips will be installed on the body and clean the body with a non-residue solvent.


    1. A005C4IE02
      Text in Illustration
      *1 Adhesive
      *a 2 to 3 mm (0.0787 to 0.118 in.) Bead of Adhesive

      Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to new roof drip side finish moulding clips.

      Tech Tips

      Adhesive strength (tensile strength): 13.7 MPa (140 kgf/cm2, 1987 psi) or more (when the temperature is 23°C (73°F).)

    2. Press and install the 2 roof drip side finish moulding clips.

    3. Install the clips to the positions on the roof panel shown in the illustration. Determine the locations and firmly press and install the 2 roof drip side finish moulding clips after lightly applying adhesive (3M DP-105 or equivalent).

      A005DI1E02
      Text in Illustration
      *1 Protruding Part - -
      Standard Dimension
      Installation Area Dimension Measurement
      for Front Side A 3.5 mm (0.138 in.)
      B 1.7 mm (0.0669 in.)
      C 0.9 mm (0.0354 in.)
      for Rear Side D 3.5 mm (0.138 in.)
      E 0.8 mm (0.0314 in.)
      F 3.5 mm (0.138 in.)
    4. Install the roof drip center side finish moulding when 20 minutes or more have elapsed after pressing and installing the 2 roof drip side finish moulding clips.

      Tech Tips


      • Initial hardening time: 20 minutes

      • Complete hardening time: 48 hours

  4. INSTALL ROOF DRIP CENTER SIDE FINISH MOULDING (for Glass Roof)


    1. Engage the 2 clips and install the roof drip center side finish moulding.