PROCEDURE
INSTALL ROOF DRIP SIDE FINISH MOULDING CLIP (for Standard Roof)
Note
If reusing the clips, do not remove the double-sided tape remaining on the clips and where the clips will be installed on the body.
If installing new clips, remove the double-sided tape remaining where the clips will be installed on the body and clean the body with a non-residue solvent.
| *1 | Adhesive |
| *a | 2 to 3 mm (0.0787 to 0.118 in.) Bead of Adhesive |
Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to new roof drip side finish moulding clips.
Tech Tips
Adhesive strength (tensile strength): 13.7 MPa (140 kgf/cm2, 1987 psi) or more (when the temperature is 23°C (73°F).)
Press and install the 2 roof drip side finish moulding clips.
Install the clips to the positions on the roof panel shown in the illustration. Determine the locations and firmly press and install the 2 roof drip side finish moulding clips after lightly applying adhesive (3M DP-105 or equivalent).
| *1 | Protruding Part | - | - |
| Installation Area | Dimension | Measurement |
|---|---|---|
| for Front Side | A | 3.5 mm (0.138 in.) |
| B | 2.5 mm (0.0984 in.) | |
| C | 0.8 mm (0.0314 in.) | |
| for Rear Side | D | 3.5 mm (0.138 in.) |
| E | 0.8 mm (0.0314 in.) | |
| F | 3.5 mm (0.138 in.) |
Install the roof drip center side finish moulding when 20 minutes or more have elapsed after pressing and installing the 2 roof drip side finish moulding clips.
Tech Tips
Initial hardening time: 20 minutes
Complete hardening time: 48 hours
INSTALL ROOF DRIP CENTER SIDE FINISH MOULDING (for Standard Roof)
Engage the 2 clips and install the roof drip center side finish moulding.
INSTALL ROOF DRIP SIDE FINISH MOULDING CLIP (for Glass Roof)
Note
If reusing the clips, do not remove the double-sided tape remaining on the clips and where the clips will be installed on the body.
If installing new clips, remove the double-sided tape remaining where the clips will be installed on the body and clean the body with a non-residue solvent.
| *1 | Adhesive |
| *a | 2 to 3 mm (0.0787 to 0.118 in.) Bead of Adhesive |
Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to new roof drip side finish moulding clips.
Tech Tips
Adhesive strength (tensile strength): 13.7 MPa (140 kgf/cm2, 1987 psi) or more (when the temperature is 23°C (73°F).)
Press and install the 2 roof drip side finish moulding clips.
Install the clips to the positions on the roof panel shown in the illustration. Determine the locations and firmly press and install the 2 roof drip side finish moulding clips after lightly applying adhesive (3M DP-105 or equivalent).
| *1 | Protruding Part | - | - |
| Installation Area | Dimension | Measurement |
|---|---|---|
| for Front Side | A | 3.5 mm (0.138 in.) |
| B | 1.7 mm (0.0669 in.) | |
| C | 0.9 mm (0.0354 in.) | |
| for Rear Side | D | 3.5 mm (0.138 in.) |
| E | 0.8 mm (0.0314 in.) | |
| F | 3.5 mm (0.138 in.) |
Install the roof drip center side finish moulding when 20 minutes or more have elapsed after pressing and installing the 2 roof drip side finish moulding clips.
Tech Tips
Initial hardening time: 20 minutes
Complete hardening time: 48 hours
INSTALL ROOF DRIP CENTER SIDE FINISH MOULDING (for Glass Roof)
Engage the 2 clips and install the roof drip center side finish moulding.