DESCRIPTION
The hybrid vehicle control ECU controls the back-up light.
WIRING DIAGRAM
CAUTION / NOTICE / HINT
Note
Inspect the fuses for circuits related to this system before performing the following inspection procedure.
PROCEDURE
CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - AUXILIARY BATTERY AND BODY GROUND)
Disconnect the 1H No. 1 integration relay connector.
Measure the voltage and resistance according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
Disconnect the 1G No. 1 integration relay connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - HYBRID VEHICLE CONTROL ECU)
Disconnect the A22 hybrid vehicle control ECU connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - REAR COMBINATION LIGHT ASSEMBLY)
Disconnect the S18 rear combination light assembly RH connector or the R17 rear combination light assembly LH connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK NO. 1 INTEGRATION RELAY
Replace the No. 1 integration relay with a new or known good one Click here.
Check that the back-up light operates normally.
| OK |
|---|
| The back-up light operates normally. |
| OK |
|
END (NO. 1 INTEGRATION RELAY WAS DEFECTIVE) |
| NG |
|
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE Click here |