FRONT STABILIZER BAR(for CVT) INSPECTION

PROCEDURE

  1. INSPECT FRONT STABILIZER LINK ASSEMBLY

    1. C066721

      Inspect the turning torque of the ball joint.

      1. Secure the front stabilizer link assembly in a vise using aluminum plates.

      2. Install the nut to the front stabilizer link assembly stud.

      3. Using a torque wrench, turn the stud continuously at a rate of 3 to 5 seconds per turn and take the torque reading on the 5th turn.

        Turning torque

        0.05 to 1.96 N*m (0.6 to 19 kgf*cm, 0.5 to 17 in.*lbf)

        Tip:

        If the turning torque is not within the specified range, replace the front stabilizer link assembly with a new one.

    2. Inspect the dust cover.

      1. Check that the dust cover is not cracked and that there is no grease on it.

        Tip:

        If the dust cover is cracked or there is grease on it, replace the front stabilizer link assembly with a new one.