FRONT CRANKSHAFT OIL SEAL INSTALLATION

PROCEDURE

  1. INSTALL TIMING CHAIN COVER OIL SEAL

    1. Apply MP grease to the lip of a new timing chain cover oil seal.

      Note:

      Keep the lip free from foreign matter.

    2. A351482C02

      *a

      Tap in depth

      Using SST and a hammer, tap in the timing chain cover oil seal until its surface is flush with the timing chain cover assembly edge.

      09223-22010

      Note:
      • Keep the lip free from foreign matter.

      • Do not tap in the timing chain cover oil seal at an angle.

      Tip:

      Timing chain cover oil seal tap in depth: - 0.5 to 0.5 mm (- 0.0197 to 0.0197 in.)

  2. INSTALL CRANKSHAFT PULLEY

    1. A352674C02

      *a

      Hold

      *b

      Turn

      Using SST, hold the crankshaft pulley in place and tighten the crankshaft pulley set bolt.

      09213-70011

      09213-70020

      09330-00021

      180 N*m

      1835 kgf*cm

      133 ft.*lbf

  3. INSTALL V-RIBBED BELT

  4. INSTALL FRONT SUSPENSION MEMBER REINFORCEMENT RH

  5. INSPECT FOR ENGINE OIL LEAK

  6. INSTALL REAR ENGINE UNDER COVER RH

  7. INSTALL NO. 1 ENGINE UNDER COVER

  8. INSTALL FRONT WHEEL RH

    103 N*m

    1050 kgf*cm

    76 ft.*lbf