ЖИДКОСТЬ БЕССТУПЕНЧАТОЙ ТРАНСМИССИИ ЗАМЕНА

CAUTION / NOTICE / HINT

The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed, installed, or replaced during the Continuously variable transaxle fluid replacement are shown below.

Necessary Procedure After Parts Removed/Installed/Replaced
Replacement Part or Procedure Necessary Procedures Effects/Inoperative when not Performed Link
CVT fluid ATF thermal degradation estimate reset The value of the Data List item "ATF Thermal Degradation Estimate" is not estimated correctly

Click here

PROCEDURE


  1. REMOVE REAR ENGINE UNDER COVER LH

    Click here

  2. REPLACE CONTINUOUSLY VARIABLE TRANSAXLE FLUID


    1. Lift the vehicle. [*1]

      Note

      Set the vehicle on a lift so that the vehicle is kept level when it is lifted up (make sure that the tilt angle from the front to rear of the vehicle is within +/- 1°).

    2. B006KXK

      Remove the refill plug and gasket from the rear transaxle case. [*2]

    3. B006NU2

      Using a 10 mm hexagon socket wrench, remove the drain plug and gasket from the transaxle oil (CVT) pan sub-assembly. [*3]

    4. B006MG7

      Measure the amount of fluid drained. [*4]

      Tech Tips

      Add the same amount of fluid in step [*6].

    5. B006NU2

      Using a 10 mm hexagon socket wrench, temporarily install the gasket and drain plug to the transaxle oil (CVT) pan sub-assembly. [*5]

      Tech Tips

      Reuse the old gasket as the drain plug will be removed again when flushing the CVT fluid.

    6. B006NYS

      Add fluid to the refill hole using the same amount of fluid drained in step [*4]. [*6]

      Note

      Use Toyota Genuine CVT Fluid FE.

    7. B006KXK

      Temporarily install the gasket and refill plug to the rear transaxle case. [*7]

      Tech Tips

      Reuse the old gasket as the refill plug will be removed again when flushing the CVT fluid.

    8. Lower the vehicle. [*8]

    9. Start the engine. [*9]

    10. Slowly move the shift lever from P to D, and then back to P (keep the shift lever in each position for approximately 3 seconds). [*10]

      Tech Tips

      Slowly move the shift lever to circulate the fluid through each part of the continuously variable transaxle assembly.

    11. Allow the engine assembly to idle for 30 seconds to warm it up. [*11]

    12. Turn the engine switch off. [*12]

    13. Repeat steps [*1] to [*12].

    14. Repeat steps [*1] to [*12].

    15. B006NU2

      Using a 10 mm hexagon socket wrench, install a new gasket and the drain plug to the transaxle oil (CVT) pan sub-assembly.

      Torque:
      49 N*m  { 500 kgf*cm, 36 ft.*lbf }
  3. ADD SPECIFIED AMOUNT OF FLUID

    Click here

  4. AIR BLEED OIL PUMP WITH MOTOR ASSEMBLY

    Click here

  5. ADJUST FLUID TEMPERATURE (when Using the GTS)

    Click here

  6. ADJUST FLUID TEMPERATURE (when Not Using the GTS)

    Click here

  7. ADJUST FLUID LEVEL

    Click here

  8. REBUILD WORK

    Click here

  9. INSTALL REAR ENGINE UNDER COVER LH

    Click here