ROOF DRIP SIDE FINISH MOULDING INSTALLATION
CAUTION / NOTICE / HINT
Use the same procedure for the RH side and LH side.
The following procedure is for the LH side.
PROCEDURE
INSTALL NO. 1 ROOF DRIP SIDE FINISH MOULDING CLIP
Note:When installing new No. 1 roof drip side finish moulding clips, remove any double-sided tape remaining where the No. 1 roof drip side finish moulding clips will be installed to the vehicle body and clean the vehicle body with a non-residue solvent.
-
*a
Adhesive
*b
2 to 3 mm Bead of Adhesive
Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to each new No. 1 roof drip side finish moulding clip.
Tip:Adhesive strength (tensile strength): 13.7 MPa (140.0 kgf/cm2, 1987 psi) or more (when the temperature is 23°C (73°F).)
for Normal Roof:
Install the 2 No. 1 roof drip side finish moulding clips to the positions on the roof panel shown in the illustration. Determine the locations and firmly press and install the 2 No. 1 roof drip side finish moulding clips after lightly applying adhesive.
*a
Protruding Part
-
-
Standard Measurement
Area
Measurement
Area
Measurement
A
11.2 mm (0.441 in.)
B
4.0 mm (0.157 in.)
C
1.1 mm (0.0433 in.)
D
3.6 mm (0.142 in.)
E
4.0 mm (0.157 in.)
F
16.9 mm (0.665 in.)
G
1.2 mm (0.0472 in.)
H
5.0 mm (0.197 in.)
for Canvas Top:
Install the 4 No. 1 roof drip side finish moulding clips to the positions on the roof panel shown in the illustration. Determine the locations and firmly press and install the 4 No. 1 roof drip side finish moulding clips after lightly applying adhesive.
*a
Protruding Part
-
-
Standard Measurement
Area
Measurement
Area
Measurement
A
11.2 mm (0.441 in.)
B
4.0 mm (0.157 in.)
C
19.4 mm (0.764 in.)
D
1.5 mm (0.0591 in.)
E
3.6 mm (0.142 in.)
F
0.7 mm (0.0276 in.)
G
3.6 mm (0.142 in.)
H
4.0 mm (0.157 in.)
I
4.0 mm (0.157 in.)
J
4.8 mm (0.189 in.)
K
16.9 mm (0.665 in.)
L
8.1 mm (0.319 in.)
M
3.1 mm (0.122 in.)
N
11.1 mm (0.437 in.)
O
5.1 mm (0.201 in.)
-
-
Install the roof drip side finish moulding when 20 minutes or more have elapsed after pressing and installing the No. 1 roof drip side finish moulding clips.
Tip:Initial hardening time: 20 minutes
Complete hardening time: 48 hours
-
INSTALL ROOF DRIP SIDE FINISH MOULDING (for Normal Roof)
-
Engage the 2 No.1 roof drip side finish moulding clips to install the roof drip side finish moulding.
-
INSTALL ROOF DRIP SIDE FINISH MOULDING (for Canvas Top)
-
Engage the 2 No.1 roof drip side finish moulding clips to install the roof drip side finish moulding.
-
INSTALL REAR ROOF DRIP SIDE FINISH MOULDING (for Canvas Top)
-
Engage the 2 No. 1 roof drip side finish moulding clips to install the rear roof drip side finish moulding.
-