ECM УСТАНОВКА

PROCEDURE


  1. INSTALL NO. 2 ECM BRACKET


    1. Install the No. 2 ECM bracket to the ECM with the 2 screws.

      Torque:
      4.5 N*m  { 46 kgf*cm, 40 in.*lbf }
  2. INSTALL NO. 1 ECM BRACKET


    1. Install the No. 1 ECM bracket to the ECM with the 2 screws.

      Torque:
      4.5 N*m  { 46 kgf*cm, 40 in.*lbf }
  3. INSTALL ECM


    1. Engage the guide and install the ECM with the 2 bolts.

      Torque:
      13 N*m  { 133 kgf*cm, 10 ft.*lbf }

      Note

      If the ECM has been struck or dropped, replace it.

    2. Engage the wire harness clamp.

    3. B006O2C

      Connect the 2 ECM connectors and lower the 2 levers.

      Note


      • When connecting the ECM connectors, make sure that the connecting parts of the ECM connectors are free of dirt, water or other foreign matter.

      • Be sure to securely connect the ECM connectors.

  4. INSTALL INLET NO. 2 AIR CLEANER


    1. Install the inlet No. 2 air cleaner with the bolt.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
  5. INSTALL INLET NO. 1 AIR CLEANER


    1. Install the inlet No. 1 air cleaner with the bolt.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
  6. INSTALL AIR CLEANER CASE SUB-ASSEMBLY

    Click here

  7. INSTALL AIR CLEANER CAP SUB-ASSEMBLY

    Click here

  8. INSTALL BATTERY

    Click here

  9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here

  10. INSTALL RADIATOR COVER SUB-ASSEMBLY (for ALPHARD)

    Click here

  11. INSTALL RADIATOR COVER SUB-ASSEMBLY (for VELLFIRE)

    Click here

  12. PERFORM INITIALIZATION

    Click here