LOAD SENSING PROPORTIONING VALVE (w/ VSC) REASSEMBLY


  1. INSTALL BLEND PROPORTIONING VALVE ASSEMBLY

    A01E01Q

    1. Install the 2 valves to the bracket with the 2 bolts.

      Torque:
      13 N*m  { 127 kgf*cm, 9 ft.*lbf }