PROCEDURE
INSTALL PCV VALVE (VENTILATION VALVE SUB-ASSEMBLY)
| *a | Adhesive |
Apply adhesive to 2 or 3 threads of the PCV valve (ventilation valve sub-assembly).
| Adhesive |
|---|
| Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent |
| *a | Torque Wrench Fulcrum Length |
Using a 22 mm ball joint lock nut wrench, install the PCV valve (ventilation valve sub-assembly) to the ventilation case.
Note
Do not start the engine for at least 1 hour after installation.
Tech Tips
Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.
When using a 22 mm ball joint lock nut wrench (fulcrum length of 149.75 mm (5.9 in.)) + torque wrench (fulcrum length of 162 mm (6.4 in.)): 10 N*m (102 kgf*cm, 7 ft.*lbf)
CONNECT VENTILATION HOSE
| *1 | PCV valve (ventilation valve sub-assembly) |
| *a | 4 to 10 mm (0.157 to 0.394 in.) |
| *b | 30° |
| *c | Top of Vehicle |
| *d | Paint Mark |
Connect the ventilation hose to the PCV valve (ventilation valve sub-assembly) and slide the clip to secure it.
Tech Tips
Engage the clip within the area shown in the illustration.
INSTALL INTAKE MANIFOLD