INTAKE MANIFOLD INSTALLATION

PROCEDURE


  1. INSTALL INTAKE MANIFOLD


    1. Install a new No. 1 intake manifold to head gasket to the intake manifold.

    2. Install the intake manifold with the 2 bolts and 2 nuts.

      Torque:
      28 N*m  { 286 kgf*cm, 21 ft.*lbf }
    3. Connect the fuel vapor feed hose and ventilation hose.

    4. Install a new O-ring to the engine oil level dipstick guide sub-assembly.

    5. Apply a light coat of engine oil to the O-ring.

    6. A005B6TE03

      Install the engine oil level dipstick guide sub-assembly with the 2 bolts and connect the wire harness clamp.

      Torque:
      Bolt (A)
      28 N*m  { 286 kgf*cm, 21 ft.*lbf }
      Bolt (B)
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    7. Install the engine oil level dipstick.

    8. A005EV8

      Connect the 2 wire harness clamps and 3 connectors.

  2. INSTALL PURGE VSV

    Click here

  3. INSTALL MANIFOLD ABSOLUTE PRESSURE SENSOR

    Click here

  4. INSTALL EGR PIPE ASSEMBLY

    Click here

  5. INSTALL THROTTLE BODY ASSEMBLY

    Click here