PARK / NEUTRAL POSITION SWITCH ADJUSTMENT


  1. ADJUST PARK/NEUTRAL POSITION SWITCH ASSEMBLY


    1. Move the shift lever to N.

    2. B007V3DE25
      Text in Illustration
      *a Neutral Basic Line
      *b Groove

      Remove the bolt from the park/neutral position switch assembly.

    3. Clean the bolt and the bolt hole.

    4. Align the neutral basic line with the groove of the park/neutral position switch assembly.

    5. Apply adhesive to 2 or 3 threads on the end of the bolt.

      Adhesive
      Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent
    6. Hold the park/neutral position switch assembly in position and tighten the bolt.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
    7. After adjustment, perform the inspection Click here.