BATTERY CURRENT SENSOR INSTALLATION

PROCEDURE


  1. INSTALL BATTERY STATE SENSOR ASSEMBLY


    1. Install the battery state sensor assembly to the battery and tighten the nut.

      Torque:
      6.4 N*m  { 65 kgf*cm, 57 in.*lbf }
    2. Connect the wire haness to the battery state sensor assembly with the nut.

      Torque:
      10.2 N*m  { 104 kgf*cm, 8 ft.*lbf }

      Note

      When disconnecting the wire haness, some systems need to be initialized after the wire haness is reconnected.

      Click here

    3. Connect the battery state sensor assembly connector.

  2. INSTALL TOOL BOX

    Click here

  3. INSTALL LUGGAGE COMPARTMENT MAT SUB-ASSEMBLY

    Click here