GENERATOR (for BOSCH Made) INSTALLATION


  1. INSTALL GENERATOR ASSEMBLY

    A01DXLFE01

    1. Install the generator and with the 2 bolts.

      Torque:
      62 N*m  { 632 kgf*cm, 46 ft.*lbf, for bolt A }
      25 N*m  { 255 kgf*cm, 18 ft.*lbf, for bolt B }
    2. Install the generator wire with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    3. Connect the generator connector.

  2. INSTALL FAN AND GENERATOR V BELT


    1. Rotate the V-ribbed belt tensioner pulley clockwise, and then install the fan and generator V belt.

      Note

      Make sure that the fan and generator V belt is set properly on each pulley.

    2. Check that the indicator mark of the V-ribbed belt tensioner Click here.

  3. INSTALL AIR CLEANER ASSEMBLY


    1. Install the air cleaner with the 2 bolts.

      Torque:
      14 N*m  { 143 kgf*cm, 10 ft.*lbf }
    2. Connect the connector to the mass air flow meter.

    3. Tighten the hose clamp.

  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.