PCV VALVE INSTALLATION
PROCEDURE
INSTALL PCV VALVE (VENTILATION VALVE SUB-ASSEMBLY)
-
*a
Adhesive
Apply adhesive to 2 or 3 threads of the PCV valve (ventilation valve sub-assembly).
Adhesive
Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent
Using a 22 mm ball joint lock nut wrench, install the PCV valve (ventilation valve sub-assembly).
20 N*m
204 kgf*cm
15 ft.*lbf
Note:Use the torque value compensation formula to calculate the torque value for use when a torque wrench is combined with a tool such as a ball joint lock nut wrench.
Do not start the engine for at least 1 hour after installation.
-
CONNECT VENTILATION HOSE
Connect the ventilation hose to the PCV valve (ventilation valve sub-assembly) and slide the clip to secure it.
INSTALL INTAKE MANIFOLD