STARTER (for 2.7 kW Type) INSTALLATION


  1. INSTALL STARTER ASSEMBLY


    1. A01DY7OE01

      Connect the ground cable and install the starter with the 2 nuts and bolt.

      Torque:
      68 N*m  { 693 kgf*cm, 50 ft.*lbf }

      Tech Tips

      Make sure to connect the ground cable with the nut as shown in the illustration.

    2. Install the starter wire to terminal 30 with the nut.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    3. Connect the starter connector.

  2. INSTALL CLUTCH RELEASE CYLINDER ASSEMBLY (for Manual Transmission)

    A01DVK3E02

    1. Install the clutch release cylinder with the 2 bolts.

      Torque:
      12 N*m  { 120 kgf*cm, 9 ft.*lbf }
  3. INSTALL FRONT FENDER SEAL


    1. Install the seal with the 5 clips.

  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.