PROCEDURE
INSTALL EXTENSION HOUSING DUST DEFLECTOR
Using SST and hammer, tap in the extension housing dust deflector.
INSTALL WIRING HARNESS CLAMP BRACKET
w/ Intelligent Manual Transmission Switch:
| *A | w/ Intelligent Manual Transmission Switch |
Install the 5 wiring harness clamp brackets to the manual transmission assembly with the 6 bolts.
w/o Intelligent Manual Transmission Switch:
Install the 4 wiring harness clamp brackets to the manual transmission assembly with the 5 bolts.
INSTALL TRANSMISSION BREATHER SUB-ASSEMBLY
Install the 3 brackets to the manual transmission assembly with the 3 bolts.
Install the transmission breather sub-assembly to the control shift lever retainer sub-assembly.
Attach the 4 breather hose clamps.
INSTALL MANUAL TRANSMISSION ASSEMBLY
Install the manual transmission assembly with the 5 bolts.
CONNECT WIRE HARNESS
w/ Intelligent Manual TransmissionSwitch
Connect the 2 connector.
Install the bolt.
Attach the 5 wire harness clamps.
w/o Intelligent Manual TransmissionSwitch
Connect the connector.
Install the bolt.
Attach the 3 wire harness clamps.
INSTALL REAR ENGINE MOUNTING INSULATOR
Install the rear engine mounting insulator to the manual transmission assembly with the 4 bolts.
INSTALL NO. 3 FRAME CROSSMEMBER SUB-ASSEMBLY
Install the No. 3 frame crossmember sub-assembly with the 4 nuts and 4 bolts.
Install the 4 bolts to the No. 3 frame crossmember sub-assembly.
CONNECT GROUND CABLE
Connect the ground cable with the bolt.
INSTALL PROPELLER SHAFT WITH CENTER BEARING ASSEMBLY
for TSAM Made:
for TMT Made:
for TMMIN Made:
INSTALL STIFFENER PLATE LH
Install the stiffener plate LH with the 4 bolts.
INSTALL STIFFENER PLATE RH
Install the stiffener plate RH with the 4 bolts.
INSTALL NO. 4 CYLINDER BLOCK INSULATOR
Install the No. 4 cylinder block insulator.
INSTALL STARTER ASSEMBLY (for 1GD-FTV)
for 2.0 kW Type:
for BOSCH Made:
INSTALL STARTER ASSEMBLY (for 2GD-FTV)
for 2.0 kW Type:
for BOSCH Made:
for 2.2 kW Type:
INSTALL STARTER ASSEMBLY (for 2KD-FTV)
for 2.0 kW Type:
for BOSCH Made:
INSTALL CLUTCH RELEASE CYLINDER ASSEMBLY
INSTALL FRONT EXHAUST PIPE ASSEMBLY (for 1GD-FTV)
INSTALL FRONT EXHAUST PIPE ASSEMBLY (for 2GD-FTV)
INSTALL FRONT EXHAUST PIPE ASSEMBLY (for 2KD-FTV)
INSTALL NO. 2 ENGINE UNDER COVER
INSTALL NO. 1 ENGINE UNDER COVER ASSEMBLY
ADD MANUAL TRANSMISSION OIL
INSTALL NO. 1 FLOOR SHIFT BUSH
Install the No. 1 floor shift bush to the floor shift shift lever assembly.
INSTALL SHIFT LEVER ASSEMBLY
|
MP grease |
Apply MP grease to the tip of the shift lever assembly.
Cover the shift lever cap with a cloth.
| *1 | Shift Lever Cap |
|
Press down |
|
Clockwise |
|
Lock |
While pressing down on the shift lever cap, turn it clockwise to install the shift lever assembly.
INSTALL SHIFT LEVER BOOT ASSEMBLY
Install the shift lever boot assembly with the 6 screws and 4 clips.
INSTALL CONSOLE BOX ASSEMBLY
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.