COMBUSTION TYPE POWER HEATER SYSTEM Power Heater Fuel Pump Circuit
| DTC Code | DTC Name |
|---|---|
| Power Heater Fuel Pump Circuit |
DESCRIPTION
When the heater switch assembly is turned on, the heater pump assembly receives a drive voltage from the heater assembly. The heater pump assembly provides the heater assembly with fuel necessary for combustion, allowing the heater assembly to operate.
WIRING DIAGRAM
PROCEDURE
CHECK HARNESS AND CONNECTOR (HEATER ASSEMBLY - HEATER PUMP ASSEMBLY)
Disconnect the A33 heater assembly connector.
Disconnect the A29 heater pump assembly connector.
Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection
Condition
Specified Condition
A33-2 (L) - A29-1 (B2)
Always
Below 1 Ω
A33-2 (L) - Body ground
Always
10 kΩ or higher
Result
Proceed to
OK
NG
NG REPAIR OR REPLACE HARNESS OR CONNECTOR
CHECK HARNESS AND CONNECTOR (HEATER PUMP ASSEMBLY - BODY GROUND)
-
*a
Front view of wire harness connector
(to Heater Pump Assembly)
Disconnect the heater pump assembly connector.
Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection
Condition
Specified Condition
A29-2 (E2) - Body ground
Always
Below 1 Ω
Result
Proceed to
OK
NG
NG REPAIR OR REPLACE HARNESS OR CONNECTOR
-
INSPECT HEATER PUMP ASSEMBLY
-
Remove the heater pump assembly.
Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection
Condition
Specified Condition
1 (B2) - 2 (E2)
Always
9 to 12 Ω
Inspect heater pump assembly operation.
Connect a positive (+) lead from the battery to terminal 1 (B2) and a negative (-) lead to terminal 2 (E2), and check the pressure of the hose by hand.
Note:This inspection must be done quickly (within 10 seconds) to prevent damage to the heater pump assembly.
OK
The pressure is applied to the hose.
Result
Proceed to
OK
NG
-
CHECK HEATER ASSEMBLY
-
*a
Front view of wire harness connector
(to Heater Pump Assembly)
Disconnect the heater pump assembly connector.
Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection
Condition
Specified Condition
A29-1 (B2) - Body ground
Engine running
Heater switch assembly on
11 to 14 V
A29-1 (B2) - Body ground
Engine running
Heater switch assembly off
Below 1 V
Result
Proceed to
OK
NG
-